PROJECT HIGHLIGHTS

Size 1500 LF; 1 Building / 7 Floors
Project Manager Suffolk Construction
Construction Suffolk Construction
Architect NBBJ
Product System TecCrete 1250, HPL Tiles, Handrails
Application Encose Frameless Glass Separating Labs and Office Spaces
Installation Timeline 8 weeks

Unique Aspects / Challenges:

  • Glass wall used to divide lab space from office corrals included a large piece of specialty laminated glass
  • Redesign of base track specificaly for this project 
  • Tight install timeframe